Ready the pour · Stage 10

Concrete Prep & Pier Drilling

Excavation, drilling, and grade work so the concrete crew arrives to a site that is actually ready.

Lago Vista · Austin · statewide across Texas

What concrete prep actually is

Everything that has to happen before the truck arrives.

We provide concrete preparation and pier drilling for projects that need excavation, grading, drilling, layout support, or site readiness before concrete is placed — slabs, ramps, patios, pads, footings, piers, tie-downs, fence posts, deck supports, and utility supports.

We are most useful where the prep involves equipment access, rock, grade changes, drilling, haul-off, or material movement. Concrete placement may be available depending on scope; we also do prep only when another contractor is handling the pour.

Years drilling Hill Country rock
8 Years drilling Hill Country rock
Service radius from Lago Vista
50 mi Service radius from Lago Vista

When you need concrete prep

  • The pour is booked and the site is not ready

    Grade, access, or excavation work standing between you and the concrete crew.

  • Piers have to go into rock

    Drilling depth and production in limestone that a standard auger will not handle easily.

  • Access is tight for concrete equipment

    Difficult terrain or restricted approach that needs planning before trucks arrive.

  • You have engineered plans to hit

    Specified depths, diameters, and layouts that need following exactly.

Sounds like something else?

If the wider site needs shaping first, that is a grading scope. If it is the whole property that needs readying, start with site prep.

How we prep for concrete

Three phases, plan to handoff.

  1. Read the site

    Review the scope · Prepare the area

  2. Do the work

    Drill or form · Manage the spoils

  3. Finish and hand it over

    Ready it for concrete · Follow the plans

Projects involving heavy rock, unknown subsurface conditions, or exact engineered requirements may need flexible pricing or field adjustments. We flag those before starting.

What drives the price

Hole count, depth, and how hard the rock is.

Drilling is priced on production, and production in limestone is unpredictable until the first holes go down. We are straight about that up front.

  • Excavation needs

    How much has to move before drilling starts.

  • Spoil management

    Where the drilled and excavated material goes.

  • Quantity, size, and depth

    How many holes, how wide, and how deep.

  • Whether we pour

    Prep only, or prep plus placement.

  • Rock conditions

    What the auger actually meets.

  • Estimates are free. If you have engineered plans, send them — specified depths and diameters let us give a much tighter number.

Walk it with us

Bring us out and we'll tell you what it needs.

  • Free consultation, no obligation
  • An honest read on your site
  • Clear next steps
  • Straight answers, no sales pressure